The Olympic Games NOx 3X200MW transformation of low boiler engineering Beijing Jingneng thermal power plant

Location:TIANJING Time:2016,2017 Click Quantity:3840 Source:本站

In the horizontal direction by using the third generation of horizontal bias pulverized coal combustion device for classification of fuel, to the water wall from the center of the flame are concentrated pulverized coal, pulverized coal, light offset two wind, the oxidizing atmosphere near the water wall, the center of the strong reducing atmosphere, the formation of "low nitrogen air bag powder the vertical direction of the combustion form;" timely and appropriate manner...

Period

Period